personal informations - address
-
education- Informations
B.Sc Mechanical Power Engineering Faculty of Engineering
Mansoura University
Egypt -
-
experiences and responsibility- Information
-
|Manage and oversee project quality to ensure compliance to codes, standards & quality program requirements
| Managing the development and implementation of the Quality Management System (QMS) for construction, execution, inspection documentation, and QA/QC activities.
| Review relevant Inspection and Test Plan “ITP”, all welding procedures specification (WPS), Procedure Qualification Records (PQR's) and NDT, PWHT and others Procedures for acceptance regarding to Project specification and applicable code
| Coordinate and Lead welding inspectors, NDT and PWHT Technician Team for project.
| Control the NDT and PWHT Status ,Calculate NDT and PWHT required Per Project , done and remaining , Repair Percentage , welders performance and take the corrective action if required
| Preparing “Test package “, following up test package ,welding progress per drawing , NDT Status , Release for hydro test and make a control of punch list
| Familiar with code and standard such as CSA, ABSA , ASME, ASTM and API
| Field of experience is in Construction of gas plant, pipeline, Electrical Power Station, petrochemical and oil Refinery industries projects
-
| Performing internal audits ,Provide , oversee, inspection activity throughout production cycle Non-conformance management – initiating, tracking, resolution and closure
| Review all welding materials control, material segregation, traceability, welding electrode, and PWHT and NDT procedures for compliance with project requirements and specifications
| Collect welding statistical information for quality, welder’s information, welder’s repairs rate and project progress management and advice the corrective action for nonconformance records
| Prepare isometric weld maps to track welds on the piping system and issue to the shop for marking and track welds , NDT , PWHT and Material traceability on the piping system for each lines class
| Ensures the quality records, acceptance certificates, mechanical completion certificates and the documentation for specific systems are prepared and collated in accordance with project requirements
| Attend the periodically meeting for quality and Progress and provide all data required concerning the quality, NDT, PWHT, Repair Rate for Welders and Project, Project progress and project status based on “Welds Tracking System”. See Details Below
-
certificates- Information
-
| API 510, Pressure Vessel Inspector Certificate ID 45693. API USA
| API 570, Piping Inspector Certificate ID 44984 API USA
| CSWIP3.1 Certificate No. 35073, Expiry date 25 Jul 2018. TWI. UK
| NDT LEVEL II (VT, UT, PT, RT, MT). According to SNT-TC-1A
| LRQA Lead Auditors. Certificate No.02/038 Lloyds Registry
-
| CWB Level II ,ASME B31.3 ,ASME VIII Div 1 ,ASME IX
| LRQA Internal Quality Auditor. Certificate No. 10/2791 Lloyds Registry.
| Industrial Quality Management . American University in Cairo
| Welding Design. American University in Cairo
| Protection against Ionizing Radiation. Atomic Energy Authority. Cairo
-
projects- Information
-
| Black Gold Harvest Project, Phoenix Industrial,Canada
| E-Methanex Damietta 1 Methanol Project. Techint Co. Egypt
| Middle East Oil Refinery Plant (Midor-Midtap). Technip Co. Egypt
-
| Neem Export pipeline 100 KM, 16 ". GNPOC. Sudan
| Burullus gas plant. Bechtel Co. Egypt
-
-
-